Call To +233579032921

Cart

Your Cart is Empty

Back To Shop

Cart

Your Cart is Empty

Back To Shop

12 trays small home food dehydrator for fruit vegetable dryer household beef jerky drying machine banana dryer

6,950.00

Products Description

Item NO.
ST-02
Product Dimension (W X D X H )
430X315X460mm
wooden case Dimension (W X D X H )
500X390X520mm
Rack Size(L X W)
290x290mm
Rack Grid Spacing
6mm
Rack Gap
30mm
Total Trays
12trays
N.W (KGS)
13kgs
G.W (KGS)
14kgs
Product Material
Food grade 304 stainless steel racks;
201 stainless steel housing, lifting handles, latches;
Tempered glass window door;Aluminum alloy door handle;
Control panel with PVC finish and touch screen
Power
800W
Voltage / Frequency
220V/50hz, 110V/60hz( MOQ:1X20GP, extra cost USD4/unit)
Temperature Ranges
20~90℃ (68~194℉)
Max. Timing
24hrs
Noise Level
50dB
Capacity
45L
Warranty
1 year warranty / Provide techinicial support according to specific issues; / Provide FOC vulnerable parts
Packages
EPE cushion
High strength corrugated carton
B/W printing manual
Notes

1. Other special requirement shall be added to related cost

2.MOQ: 20GP container, can mix models. Extra sample fee will pay back after a 20GP.
3. Lead Time: For first order 35 days, and the repeated order 30 days after all OEM artworks confirmed.
4. Payment Term: T/T 30% deposit, the balance shall be paid one week
before shipment.
5. Certs: CCC, CE, ROHS, LVD, EMC
Details Images
ODM project process

ODM project process

1.Communication Requirements: Customer provide sample or design paper with details requirements.
2.factory quoting: quotation is passed by customer and factory provide die design.
3.making prototype: within 5-7days, provide the 1:1 mock-up
4.confirmation of prototype: customer confirm the 1:1 mock-up after several adjustment
5.Opening mould. Produce the mould according to the confirmation of 1:1 mock-up,takes around 1-2months
6.testing mould. Try the mould repeatedly and make sure there is no flaws on finished products.
7.Trial production. Small mass production after passing the mould testing and do fully product test
8.Mass production. Start mass production after passing the trial production, and customer pay the deposit.
9.Inpection&delivery. Delivery within 4 weeks, customer arrange the balance payment.

Our company has perfect equipment and high-quality technical team, can customize products according to customer requirements.

Plug Type

EU, UK, US

Color

silver

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

SKU: 153916855011618 Category:
No more offers for this product!

Cart

Your Cart is Empty

Back To Shop